Immersion Tunnels

Strukton Immersion Project has more than 30 years of experience in tunnel immersion. Our field of work includes the engineering, preparation and execution of immersion processes including marine work.

The activities of Strukton Immersion Projects can be divided into a large number of activities spread across the various phases of the immersion process.

Although each project has its own dynamics and scope, the work of Strukton Immersion Projects starts with a Design Basis for floatation, transport and immersion. This is followed by a detailed design of the temporary facilities, further engineering and preparation for execution.

All engineering and preparation come together in the final execution of floating up, transporting and immersing the elements by Strukton Immersion Projects.

The entire immersion operation (OTAO®) is carried out by our experienced staff. We strive for versatility, innovation and effectiveness, resulting in quality. OTAO® has been a registered trademark of the Strukton Group since 1995 and is the abbreviation for Floating, Transporting, Immersion and sandflowing.

OTAO: immersion processes

During the tunnel element casting process, the necessary temporary provisions are made for the OTAO process. These include all cast-in items (anchors, ducts, manholes, etc.), recesses, bulkheads, ballast tanks, ballast pipes, temporary supports for the elements, the GINA-gasket, pre-stress, etc. Part of the pre-calculated quantity of ballast concrete/water is also added to the tunnel units.

Floatation

After completion of the concrete work, the ballast tanks are filled with water. The tunnel elements are sealed with temporary bulkheads, after which the casting basin dock is inundated. Controlled emptying of the ballast tanks then ensures that the tunnel elements start to float. As soon as this occurs, the element can be trimmed and the units are prepared for transport.

Transportation

Once the tunnel units are floating, tugboats and winches tow the elements to the immersion location. Depending on the tugging conditions, extra provisions are added to the tunnel units. Sea transport, for example, requires entirely different provisions from river or canal transport due to the high waves. For instance, when the Wijkertunnel was transported across the North Sea, the concrete tunnel units were provided with additional protection against the force of the waves.

Immersion

Once the tunnel element has arrived at the immersion location, winches are used to position it horizontally above a dredged trench. The tunnel element is attached to immersion pontoons, sheerlegs, cross beams or a combination of the three. At the same time, a survey system of our sister company Geocon continuously monitors the exact position of the tunnel unit.

Once the tunnel unit is in position, the ballast tanks are filled with water. This gives the tunnel negative buoyancy. The element will then slowly be immersed and connected to the land section or preceding element. In its immersed position, the tunnel unit rests on a gravel bed as final foundation or is temporary supported with a temporary support system equipped with hydraulic jacks. The jacks are used to adjust the element to its exact required vertical position. The first watertight seal at the immersed joint is achieved using the GINA profile. The second watertight seal is added to the tunnel in a later stage using an OMEGA profile.

Foundation

An immersed tunnels foundation consists either of a pre laid gravel bed tunnel or the element is first placed on a temporary support with a space underneath the element. When using a temporary support system, the space underneath the tunnel element is immediately filled with sand or grout after immersion. This creates the final foundation for the tunnel units. Using a sandflow or grout installation, pancake-shaped sand foundations are created under the tunnel element. To achieve this, divers attach a pressure pipe to the tunnel unit’s sandflow system. The sandflow stops once the pancakes supports the complete tunnel area. The temporary supports are released, and the tunnel elements rest on the sand or gout foundation. Finally, the immersion trench is back filled and the top of the tunnel unit is covered with sand and/or rock protection.

Mission accomplished!

Get in touch

Peter van Westendorp

Directeur Strukton Immersion Projects


+31 (0)6 53 73 13 44

Our experience

Project

1915 Canakkale Bridge Project

Read more
Read more about 1915 Canakkale Bridge Project

Project

Chioggia Flood Barrier

Read more
Read more about Chioggia Flood Barrier

Project

Blyth Offshore Wind Demonstrator

Read more
Read more about Blyth Offshore Wind Demonstrator
Our projects

Project

A73 Roertunnel

Read more
Read more about A73 Roertunnel

Project

Limerick Tunnel

Read more
Read more about Limerick Tunnel

Project

North – Southline CS Tunnel

Read more
Read more about North – Southline CS Tunnel
Our projects

Project

Inflatable Barrier Monaco

Read more
Read more about Inflatable Barrier Monaco

Project

Chioggia CBA02-Habitat

Read more
Read more about Chioggia CBA02-Habitat
Our projects

Strukton Immersion Projects in the media

Article

Tunnelling and Underground Space Technology – Busan Geoje Fixed Link

Read more
Read more about Tunnelling and Underground Space Technology – Busan Geoje Fixed Link

Article

Tunnelling and Underground Space Technology – North/South Metro Line

Read more
Read more about Tunnelling and Underground Space Technology – North/South Metro Line

Do you want to work with us?

Can we assist you with a great project or are you interested in a position with us? Do not wait any longer and contact us directly!

Contact